PROJECT PHOTOGRAPHY · KALAMBESHWAR

Dr. Awachar Godowns

Godown 3 · Kalambeshwar, Maharashtra

Godown 3 at Kalambeshwar, photographed from the structural-frame stage through the sheeted exterior. Janefal Godown 1 is a separate project record.

Godown 3 · sheeted frontageExact project photography · select the image to view it full size
Project
Dr. Awachar Godowns
Photographed location
Godown 3 · Kalambeshwar, Maharashtra
Building type
Godown / Storage
Stages shown
Erection → Sheeting

Janefal · a separate godown record

The existing project record also documents Godown 1 at Janefal through erection and sheeting. The photo gallery above is exclusively Godown 3 at Kalambeshwar; it does not combine the two building identities.

ENGINEERING CONTEXT

Understand the frame behind the building.

Explore the role of framing, openings and envelope coordination when planning a similar building.

This drawing is an anonymised engineering reference. It is not a drawing of Dr. Awachar Godowns.

Explore engineering & design →
Anonymised engineering reference · not assigned to this named project
About this project record

These images have been matched to Shri Satiji's project-media master and reviewed as a continuous erection-to-sheeting sequence. Only recorded project identity, location, building type and observed stages are presented. Exact dimensions, commercial values, completion dates and performance results are not inferred from photography.

PLAN YOUR NEXT BUILDING

Start with the space your business needs.

Share the location, building use, approximate dimensions, clear height, equipment requirements and timeline.

Prepare Project Brief

PROJECT LOCATION & APPLICATION

Continue from this project to your requirement.

Use the recorded Kalambeshwar site stages alongside the relevant building scope before preparing a project brief.

WhatsApp