A useful PEB quotation starts with enough information to understand the building and its operational requirements. A single cost-per-square-foot number can be misleading when span, height, loads, crane requirements, envelope specification, civil scope and site conditions are different.

Project location

City / district and site conditions influence the design basis, logistics and execution planning.

Application

Factory, warehouse, processing shed, cold storage, showroom or hall, or another use.

Dimensions

Length, width, eave/clear height and any required clear span.

Crane / machinery

Crane capacity, machinery zones, suspended loads or operational constraints.

Openings

Shutters, doors, canopies, ventilation and service openings.

Envelope

Roofing, cladding, insulation, skylight and ventilation expectations.

Expansion

Future extension direction or mezzanine requirement.

Timeline

Required project schedule and drawing / approval status.

Why PEB cost per square foot is not one fixed rate.

Two buildings with the same floor area can require different structural steel, Z purlins and secondary steel, roofing and cladding, transport, erection and civil coordination. Clear span, building height, design loads, crane or mezzanine requirements, openings, insulation, project location and site access can materially change the quotation. For that reason, use a budget rate only as an early reference and compare final quotations against the same written scope.

Compare quotations on the same scope, not only the final number.

Before comparing two PEB quotations, check whether both are based on the same building dimensions, design loads, clear height, crane or mezzanine requirement, roofing and cladding specification, openings, ventilation, insulation and civil interface. A lower total can simply mean that a major item, design assumption or site activity is excluded.

Also compare what is included for engineering and drawings, primary and secondary steel, fasteners and accessories, transport, unloading, erection, equipment, taxes, validity and delivery assumptions. If future expansion is planned, mention it before the structural concept is finalised. A clear comparison sheet makes technical and commercial discussions faster and reduces late scope changes.

Use the checklist in a real project enquiry.

Share what you already know. Missing inputs can be clarified during the first discussion.

Prepare Project Brief

BUYER DECISION GUIDE / 2 MIN ESTIMATED READ

Use this guide in your project conversation.

Choose the building solution → · Explore labelled project evidence → · Prepare Project Brief →

PROJECT BRIEF

How to compare two PEB quotations on the same scope

Use these questions to prepare a project-specific discussion with Shri Satiji.

Structural inputs

Ask each proposal to state building dimensions, design loads, crane requirements, mezzanine loads and future expansion assumptions. A rate without these inputs is not a comparable specification.

Supply and envelope

Compare steel scope, roof and wall systems, insulation, accessories, gutters, openings and coating specification. Record exclusions separately rather than assuming an item is included.

Site and civil interfaces

Confirm responsibility for foundations, anchor bolts, floor levels, erection access, drainage and equipment interfaces. Ask how site changes are approved and priced.

Commercial comparison

Check taxes, transport, unloading, erection, payment milestones, programme assumptions and warranty scope against the same requirement. Request a written project-specific quotation; this guide does not publish a fixed per-square-foot rate.

Understand PEB quotation drivers

PEB cost per sq ft: geometry, loads, scope and a floor-area planning tool →